Date: March 2018
Client: Gemeente Lingewaard
Reason: Internship assignment
Project status: finished
During my last internship I was working on a project called the revitalisation of the Zilverkamp, a project where an 80s neighbourhood was being refurbished to a state that the citizens would be more satisfied with. The area was dealing with vandalism, aging of vegetation and a feeling of unsafety ruled the area.
An inventorisation was made, and analysis showed that there were problems with dying vegetation species and a decrease of fauna and flora in the area, besides that some problem areas with sunk in pavements and parking areas needed to be resolved
A new planting plan for the area was created to boost biodiversity and to actually lower maintenance costs within the neighbourhood
Visualizations of future results along with technical details were created.
To  be able to represent the future vision for the area 3D renderings where made in Lumion.